International
Wind farm Khalladi
Objects
Unloading and assembly of wind turbines on site & Mechanical and Electrical Installation of 40 Wind Turbines V90 – 3.0MW (HH 80m).
Solution
LTM1200 Crane, 700 TN AC700 Crane in Complete Configuration, AC 250,100 and two LTM1090.
Sector :
Industry
Year :
2018
Location :
Jbel-Sendouq